Sports Club Gym Refurbishment

Case Study
We Are RAM Construction logo
Cost:
71
k
Customer:
East Grinstead Sports Club Gym
Introduction

RAM Construction helped deliver the refurbishment of East Grinstead Sports Club Gym, transforming the existing fitness areas into a modern, cohesive and highly functional training environment.

The completed scheme combines robust commercial finishes with a strong visual identity, improved lighting and carefully integrated feature details throughout the gym, studio and circulation spaces.

The works were coordinated around specialist gym equipment, client-supplied elements and multiple trade packages. The finished facility provides dedicated cardio, strength, free-weight and studio areas while maintaining a consistent design language across the building.

Project Scope

The project involved a phased internal refurbishment and fit-out, including preparatory works, alterations, finishes, specialist joinery and the coordination of electrical, lighting and equipment installations.

The project's key deliverables included
  • Strip-out and removal of redundant fixtures, finishes, ceiling elements and wall cladding.
  • Protection and phased movement of existing gym equipment to maintain safe working areas.
  • Construction of new internal partitions.
  • Installation of bespoke Perspex screening with timber framing.
  • Alterations to window openings, new window boards and associated making good.
  • Installation of new floor finishes and specialist rubber gym flooring across the training areas.
  • Comprehensive electrical and lighting works.
  • Installation of linear LED fittings, feature pendants, wall lights and mirror backlighting.
  • Full redecoration of walls, doors, beams and ceilings in a coordinated contemporary colour scheme.
  • Bespoke timber wall panelling and acoustic treatments.
  • Installation of mirrors, signage, feature logos and club branding.
  • Installation of decorative features, planting, wall graphics and display elements.
  • Final positioning of gym equipment, completion works and final clean.
  • The Project’s Key DeliverablesPhased Refurbishment

‍

A phased programme enabled the existing spaces to be stripped out, prepared and upgraded in a controlled sequence.

Temporary protection and careful coordination were required because gym equipment remained within or close to the working areas during parts of the fit-out. This approach allowed the various construction and specialist packages to be completed safely and efficiently.

Lighting and Electrical Improvements

The lighting package introduced linear LED fittings, feature pendants, wall lights, illuminated mirrors and bespoke planting lights.

The new lighting reinforces the geometry of the interior design while providing suitable illumination across the different exercise areas. Existing electrical requirements and outstanding works from the earlier phase were also coordinated as part of the fit-out.

Bespoke Interior Features

Purpose-made details included timber wall panelling, framed translucent partitions, acoustic finishes, feature logos, shelving, mirrors and signage.

These elements established a recognisable identity for the refurbished facility while giving the interiors a crafted, high-quality appearance.

Durable Fitness Finishes

Specialist rubber flooring, resilient painted surfaces and robust wall treatments were used to meet the demands of a busy commercial gym.

The completed spaces balance durability and ease of maintenance with a bright, contemporary finish suitable for intensive daily use.

Coordinated Training Zones

The refurbished facility was arranged to provide distinct areas for cardio training, strength equipment, free weights and studio activity.

Finishes, lighting and equipment layouts were coordinated across the individual zones to create a consistent and practical environment throughout the building.

Challenges

Working Around Specialist Equipment

Large items of gym equipment had to be protected, repositioned and coordinated alongside the construction activities.

Careful sequencing of the trades was essential to preserve access, avoid damage and allow finishes to be completed accurately around the specialist equipment.

Coordinating Multiple Design Elements

The scheme brought together lighting, electrical work, decoration, glazing, timberwork, acoustic products, mirrors, graphics, planting and specialist gym equipment.

Careful setting out was required to ensure that feature components aligned consistently across the walls, ceilings and circulation areas.

Delivering Detail Across Varied Spaces

The building contains areas with different ceiling heights, exposed structural elements and varied operational uses.

The fit-out therefore required adapted solutions for the main gym, strength room, cardio area, studio and first-floor circulation spaces while maintaining a unified overall finish.

Phased Trade Coordination

The project involved RAM Construction working alongside client-appointed suppliers and specialist contractors responsible for elements including gym equipment, flooring, electrical works, windows, planting and signage.

Maintaining a coordinated programme and clear interfaces between the different packages was central to delivering the completed scheme.

Outcome

The completed refurbishment created a modern sports and fitness environment with a clear visual identity and a strong balance between performance, durability and design.

The upgraded facility provides dedicated zones for cardio, strength, free weights and studio activity, supported by improved lighting, specialist flooring and carefully coordinated equipment layouts.

Feature timberwork, illuminated mirrors, planting, wall graphics and club branding add warmth and character to the practical training spaces.

The result is a distinctive and welcoming facility that demonstrates RAM Construction’s ability to coordinate detailed commercial interior works and deliver a high-quality finish across a complex leisure environment.

‍

No items found.
Conclusion

RAM Construction is proud to have contributed to the transformation of East Grinstead Sports Club Gym.

The project showcases our commercial refurbishment capability, attention to detail and experience coordinating specialist trades, client-supplied finishes and operational requirements within an active sports and leisure setting.

The completed scheme provides East Grinstead Sports Club with a modern, durable and visually distinctive fitness environment designed to support the continued use and development of the facility.